China Long Distance Pipeline Construction Pneumatic Internal Clamp

Product Details
Customization: Available
Product Name: Pipeline Internal Clamp
Weight (Kg): 200
Manufacturer/Factory, Trading Company
Diamond Member Since 2024

Suppliers with verified business licenses

Registered Capital
1000000 RMB
Plant Area
101~500 square meters
  • China Long Distance Pipeline Construction Pneumatic Internal Clamp
  • China Long Distance Pipeline Construction Pneumatic Internal Clamp
  • China Long Distance Pipeline Construction Pneumatic Internal Clamp
  • China Long Distance Pipeline Construction Pneumatic Internal Clamp
  • China Long Distance Pipeline Construction Pneumatic Internal Clamp
  • China Long Distance Pipeline Construction Pneumatic Internal Clamp
Find Similar Products
  • Overview
  • Product Description
  • Product Features
  • Product Parameters
  • Product Major Component
  • Application of Major Component
  • Product Photos
  • Company Profile
Overview

Basic Info.

Model NO.
DKQ
Condition
New
Machine Type
Riveting Machine
Keyword
Clamp
Color
Customer Requirement
Warranty of Core Components
1 Year
Video Outgoing-Inspection
Provided
Core Components
PLC, Engine, Motor
Key Selling Points
Easy to Operate
Machinery Test Report
Provided
Transport Package
Export Package
Specification
Customized
Trademark
WINCOO
Origin
Jiangsu, China

Product Description

Hymaron Engineering Machinery Co.,ltd is engaged in bringing the most suitable solutions/equipment for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction, industrial production lines, clean energy project and other industrial field.
Pipeline Internal Clamp (Lone Distance Pipeline Construction Equipment)

Product Description

The pneumatic internal mouthpiece produced by our company is developed by absorbing advanced technology and experience of domestic and foreign products and combining with the construction characteristics of Chinese pipeline construction enterprises. Using compressed air as power, no pollution, especially suitable for the construction of water pipelines and oil and natural gas pipelines with high environmental protection requirements. It has the advantages of reliable performance, strong adaptability, quick action, accurate matching, compact structure, simple operation and accurate clearance adjustment. Product quality and performance can be comparable to the international similar products, including clearance type pneumatic inner mouthpiece, copper shoe type pneumatic inner mouthpiece, Marine pneumatic inner mouthpiece, fill the domestic market blank.China Long Distance Pipeline Construction Pneumatic Internal Clamp

Product Features

1. Simple structure and beautiful appearance
2. Light weight, fast walking speed, strong climbing ability, small gas consumption
3. Large support, accurate clearance adjustment, greatly improve the construction efficiency
4. The valve parts are imported, the joint is made of stainless steel material to ensure that the air path is clean, and the joint type is C-type structure to ensure reliable sealing performance
5. The walking frame is manufactured strictly in accordance with the technological tooling to ensure the performance of the walking wheel set and improve the performance of the whole machine
6. From manufacturing to installation and commissioning, the whole machine is strictly implemented in accordance with national standards and processes, ensuring that the amount of misalignment and the precision of clearance adjustment is within 0.5mm,meeting the requirements of pipeline construction standards
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
 
 

Product Parameters

Non-self-propelled Clamp (Manual Pulled)
Model
Pipe Size
Piston No.s
Piston Power
L
W
H
Weight
Cube
(mm)
(KN)
(mm)
(mm)
(mm)
(kg)
(m3)
HGDNQ6''
168
6X2
134
1473
150
150
36
0.04
HGDNQ8''
219
6X2
209
1593
189
189
53
0.06
HGDNQ10''
273
6X2
382
1665
240
240
60
0.09
HGDNQ12-14''
305-357
6X2
405
1751
280
280
100
0.14
Self-propelled Clamp (Travels Under Its Own Power)
Model
Pipe size (mm)
Pistons (Nos)
Piston
Power (KN)
Motor power (Hp)
L (mm)
W (mm)
H (mm)
Weight
(KG)
Cube
(M³)
HGDNQ16-18''
406-457
8x2
959
1
2132
360
360
188
.29
HGDNQ20-22''
508-559
10x2
1057
1.5
2434
480
480
296
.59
HGDNQ22-24''
559-610
12x2
1268
1.5
2500
530
530
390
.72
HGDNQ24-26''
610-660
12x2
1268
1.5
2672
580
580
418
.90
HGDNQ28-30''
711-762
12x2
1748
1.5
2700
670
670
512
1.2
HGDNQ30-32''
762-813
14x2
2937
3
2938
690
690
733
1.4
HGDNQ34-36''
864-914
16x2
2937
3
3020
790
790
779
1.8
HGDNQ36-38''
914-965
18x2
2937
3
3188
860
860
865
2.4
HGDNQ40-42''
1016-1067
20x2
2937
3
3029
980
980
982
3.0
HGDNQ46-48''
1168-1219
20x2
4855
3
3100
1050
1050
1420
3.7
HGDNQ48-50''
1219-1270
22x2
4855
3
3517
1120
1120
1876
5.2
HGDNQ52-54''
1321-1372
22x2
4855
3
3520
1210
1210
1988
5.4
HGDNQ56''
1422
22x2
4855
3
3500
1310
1310
2187
6.6
HGDNQ60''
1524
22x2
4855
3
3500
1310
1310
2187
6.6
HGDNQ62-66''
1574-1676
24x2
4855
3
3864
1557
1557
2887
10.0
HGDNQ68-72''
1727-1727
24x2
4855
3
3864
1557
1557
2887
10.0
HGDNQ76-80''
1930-2032
30x2
4855
3
4000
1800
1800
3855
13.0
 
 

Product Major Component

Main components of the mouthpiece: mouthpiece assembly ( Swelling block), clearance cylinder, driving assembly, walking frame, walking wheel, brake assembly, gas tank, front cage frame, joystick (gas pipe), gas path assembly, etc., controlled by compressed air as power source. See the picture below.
China Long Distance Pipeline Construction Pneumatic Internal Clamp

1, Front cage frame; 2, Clearance cylinder; 3, Front swelling block; 4, Back swelling block; 5, Gas path; 6, Gas tank;
7, Adjustable nut; 8, Mouthpiece assembly; 9, Front walking wheel; 10, Brake assembly; 11, Walking frame;
12, Driving assembly; 13, Back walking wheel

China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
 
 
 
 
 
 

Application of Major Component

A. First of all, the air compressor is connected with the joystick (gas path) and the air inlet pipe on the front cage frame with a high pressure hose and a quick joint to achieve the purpose of filling or filling air; The joystick (gas path) is then connected to the control shaft on the front cage frame by a hook.
B. The joystick (gas path) is welded by hollow steel pipe, and its function:
1, Supplementary gas volume. 2, Air path control: front row rising, front row shrinking, back row rising, back row shrinking, clearance opening, clearance closing. 3, Control the forward movement of the mouthpiece.
C. The control cable is used to control the driving walking, braking, forward and backward pointing. When walking, the forward walking cable should be tightened, and the automatic brake will be applied when it is released to prevent too fast speed when going downhill. If it is necessary to move forward, quickly tighten the cable and quickly loosen the cable to realize the point walking.
D. The gas tank is installed at the end of the mouthpiece, and its function is as follows: 1, Realize the balance of the whole machine. 2, Gas storage.
E. The mouthpiece assembly is the core part of the clamp device, which is composed of the cylinder, the distributor and two groups of swelling block (holding claw), etc., which mainly completes the matching.

Product Photos

 
 
 
 
 
 
 
 
 
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp
China Long Distance Pipeline Construction Pneumatic Internal Clamp

Company Profile

Hymaron Engineering Machinery Co.,ltd is engaged in bringing the most suitable solutions/equipments for client, fabricators, EPC/C companies on pipe fabrication, tank construction, pipeline construction,industrial production lines, clean energy project and other industrial field.

Our Services & Strength
We have ability of providing workable solutions to support clients to be awarded with shorter project execution time, fewer man-hour cost and higher efficiency construction/fabrication method and better quality during phase of project bidding.

Based client's facility/site space availability, we are able to study/design and present matched configurations on project schedule, quality, cost and productivity to guarantee production pace is accordance with project requirement.

To support project execution, we are always ready to work as fireman to give prompt supply on project materials from different consumables, tools, equipments/machines to special merchandise. With flexibility, we are also glad to perform as procurement agent in China to seek required supply resources.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier